We treat documentation as part of the product. If a part arrives without the paperwork to prove it, it is not finished — and no amount of dimensional accuracy on the bench changes that.
Current certificates are issued with quotations on request. Expiry dates are tracked and re-audits are booked four months ahead.
Quality management system
Automotive quality management
Environmental management
Substance compliance
Material certificates
Production part approval
Metrology is in house rather than subcontracted. Subcontracted inspection introduces a week into every shipment and removes a layer of accountability from the report.
| Equipment | Qty | Notes |
|---|---|---|
| Coordinate measuring machines | 3 | 700 × 1000 × 600 mm, 1.8 µm accuracy |
| Optical profile projectors | 4 | Thread forms, radii, Ra 0.4 surfaces |
| Universal tensile testers | 2 | Up to 600 kN |
| Hardness testers | 6 | Rockwell, Vickers, Brinell |
| Salt spray chambers | 2 | ASTM B117 to 1000 hours |
| Coatings thickness gauges | 8 | Magnetic and eddy current |
| Optical sorting machines | 4 | 100% dimensional screening in line |
| XRF analysers | 2 | Material grade verification on receipt |
Rolling 12-month average of 620 PPM on shipped lots. PPM is reported monthly by customer, and any month above 1,000 PPM triggers a documented corrective action.
Tell us which document and which entity it needs to be addressed to. We send ISO certificates, insurance, and a completed supplier questionnaire within two business days.
Send a STEP file or a PDF drawing with your annual volume. Technical review within one business day, indicative pricing within three.