Roughly 90 machines across forging, machining, stamping, welding and finishing — which is what lets us hold one process route for a part instead of splitting it across three suppliers and an argument about tolerances.
Installed capacity at the Ningbo site. Utilisation is reported weekly; normal lead times assume 70–80% loading.
| Machine group | Qty | Capacity |
|---|---|---|
| Cold forging machines | 12 | M3 – M20, 90–380 pcs/min |
| Hot forging line | 2 | Up to M64, 12 kg |
| CNC turning centres | 28 | Ø3 – 120 mm, 600 mm length |
| Multi-spindle / 4-axis lathes | 9 | High-volume turned parts |
| 5-axis machining centres | 6 | 800 × 500 × 400 mm |
| 3-axis CNC mills | 14 | 1200 × 600 × 500 mm |
| Progressive-die presses | 16 | 25 – 250 t, 0.3 – 8 mm |
| Fibre laser cutting | 3 | 6 mm carbon steel, 4 mm stainless |
| CNC press brakes | 8 | 3 m, 135 t |
| Welding stations (MIG / TIG / spot) | 12 | Fixtured, certified operators |
| Continuous mesh-belt heat treatment | 2 | Quench and temper, case hardening |
| Plating and anodising lines | 3 | Zinc Cr3, zinc-nickel, anodising |
Nine engineers, and their job is not only to make the part — it is to tell you when the drawing is making it expensive for no functional reason. That conversation happens before the quote, not after the first shipment.
Tooling paid for by the customer remains the customer's property and is marked and stored as such. We will release it on request at any time, including if you decide to move production.
Send a STEP file or a PDF drawing with your annual volume. Technical review within one business day, indicative pricing within three.